On February 1st my flat bed trailer entered the garage and construction began on the well pump house. Other than having to purchase more screws from my local Home Depot, it appears that everything required is on hand. I say that, somewhat confidently, as the project is essentially complete short only the application of the cedar siding. The most interesting part of the project has been planning how to assemble everything with only limited ceiling clearance. I left one wall open until the very end to allow access to the interior since the house is built lying on its back with the future door opening on the top.